Pages

Monday, January 2, 2017

Horizontal Stab start

I stretched out the rudder work because a big block of time was needed for the priming and trailing edge proseal steps.  So to fill it in I started on the HStab.  My dad stayed over after his birthday dinner and helped debur the rear spar.



The instructions have you prime the spar early on, so I did that along with the the rudder parts.  Then you assemble it with some brackets.



Then its time for some fabrication.  You take 2x2 1/8" angle aluminum stock and make it conform to some very specific dimensions, down to the 1/32".  These are the pieces that broke my first bandsaw blade.  I think they came out great though.

No comments:

Post a Comment